Tenant improvements

Tenant improvement permits & build-out

Fitting out a leased retail or office space — drawn, permitted and built to hand over code-compliant.

Tenant improvements

How it compares to the other two.

Plans

Your plans start with your scope.

Every commercial space is different — bring us your scope. Send us the address, the lease and what the space has to become, and we will walk you through what the building, fire and accessibility reviews typically ask for.

A commercial interior under fit-out — metal stud framing, exposed services and a bench saw

Rules that apply.

Limits vary by jurisdiction. These are the levers that decide what fits on your lot — we confirm every one of them against your city before design starts.

  • Typical triggerNew lease or refit
  • Accessibility upgradeMay be triggered by scope
All the rules that apply, with citations
  • Fire reviewSeparate track
  • OccupancyExisting classification retained

These are the reviews and limits that typically govern this work. Most are set by your jurisdiction and by the building, fire and accessibility codes — they are requirements, not starting points. We confirm exactly which ones apply to your address and scope before design starts. See regulations by city. Statutes reviewed 4 August 2026.

Is this you? When this is the right call
An empty commercial interior shell ready for fit-out
You have signed a lease and need the space usable.
Your landlord allowance has a deadline attached to it.
You need the build-out to clear building, fire and accessibility review.

Feasibility → design → permit → build — the same four steps as every project we run. See how the process works.

Start with a free consultation.

Under an hour, no pressure — we talk through what your lot allows and give you a ballpark for your property. No charge, and no obligation to go further.

Free consultationRegulations by city